St. Louis 314.333.4444
St. Charles 636.447.1649

Asphalt Paving in St Louis and St Charles

Asphalt Parking Lot Paving  in St Louis and St Charles MO Call (314) 333-4444 for a Free Estimate or Fill Out Form Below  ↓↓↓

Asphalt Parking Lot Paving St Louis and St Charles MO

Paving contractor applying asphalt tack coat on parking lot in St LouisBefore paving over existing asphalt, roads and parking lots are cleaned of debris using gas powered blowers. Tack coat is applied to the asphalt surface as an adhesive to help adhere new hot asphalt to the old asphalt surface
Asphalt Tack Coat Application
Asphalt company Installing a new storm water sewer Inlet in St Louis MOMilling in front of concrete sidewalks, entrances and others areas where the new asphalt will need to be paved flush, will be done before resurfacing with new asphalt. New concrete sewer inlets which need to be installed, will be raised with 2″ inch riser rings, to maintain the same level as before the new asphalt overlay.
New Sewer Inlet Installation Before Asphalt Overlay
Asphalt paving companies in St Louis and St Charles MOResurfacing or overlaying parking lots with 2″ inches of new asphalt,  require a paving crew of two operators, two shovel guys and two lute men and two roller operators. Two asphalt paving machine operators are responsible for adjusting the paver to maintain a finished level surface.
Asphalt Paving Machine Operators
Asphalt contractor hand luting an asphalt seam in St LouisShovel men will get asphalt from the paving machine, while directed by the lute men, will toss the asphalt to a spot on the parking lot. The lute men will then rack out the asphalt in low areas which may have created a puddle. Lute men are also responsible to level out seams created by the paving machine.
Lute Man Working an Asphalt Seam
Asphalt paving company compacting new asphalt parking lot in St Louis MOCompaction of the new asphalt is typically done by two people, on two different size rollers. A larger roller for the initial compaction, followed by a person on a smaller finish roller. Both are vibratory rollers which require water, which is slowly being poured over the drums to help prevent small asphalt pieces sticking to the drums causing marks in finished surface.
Vibratory Asphalt Compaction Roller
Paving contractor dumping hot asphalt on parking lot in St Louis MOA tandem double axle dump truck ( one axle in front, two in the back) returns to the job site after picking up 15 tons of hot ( typically 320 degrees ) asphalt from the asphalt plant.  The asphalt is then dumped on an older asphalt area, pick up by a skid loader and placed in the hopper of the paving machine.
Double Axel Dump Truck Dumping 15 Tons of Hot Asphalt
Painting and striping a new parking lot in St Louis MOOnce the parking lot overlay paving is completed, it’s time to restripe ( paint ) the new asphalt. If the customer wants to make changes to the layout of the parking lot, or make changes to be ADA compliance, this decision needs to be made before paving the parking lot. The transition from paving to striping happens quickly, so any changes need to be finalized ahead of time.
Painting New Parking Lot Handicap Area

    Estimate Request Form or Call (314) 333-4444

     

    * Indicates Required Field  ( Option to Add Job Site Photos or Files below )

    Customer Info










    Job Info



    Work Type


    We would LOVE to see your job site PHOTOS or Files.

     

    Filetypes accepted:.... jpg | jpeg | png | gif | pdf | | mp4 | mp3 | mpg | doc | xlsx


     


    (You will see a confirmation here after clicking "Send" it may take up to 45 seconds if you uploaded (5) photos)